Recognition
wins the 'Best Energy Storage Project Award'
at the Mercom India Clean Energy Awards 2024
Our in-house team of energy professionals has installed more than 150 clean solar energy projects across 500 roofs. From asset design to asset management, we take care of everything
*Includes projects, deployed, contracted and under-development
Hundreds of
SunSource Energy's Commercial, Industrial and
Institutional customers have improved bottom-line by transitioning to Solar
One of the leading textile companies in the Bhilwara Industrial Belt wanted to move to solar power to reduce its dependence on coal-based power since it was a challenge for them to procure and store the same for their captive thermal power plant. The client also wanted to transition to solar-based power as it wanted to reduce its cost of operations. As the client had a large land parcel available within the premises, we developed an on-site rooftop+ground mount solar solution.
Off-Site Solar
India’s leading conglomerate’s clean energy transition with SunSource Energy
Off-Site Solar
Reducing Energy cost and simplifying the energy transition for one if India’s leading Steel processing companies.
Find out how much you can save with Solar?
SunSource Energy is helping some of the world’s leading organizations with their energy transition.
Off-Site Solar
India’s leading conglomerate’s clean energy transition with SunSource Energy
Off-Site Solar
Reducing Energy cost and simplifying the energy transition for one if India’s leading Steel processing companies.
Find out how much you can save with Solar?
Client
Each state has different regulations for Open access projects. Hence, charges for such projects vary with its location and procurement model. However, most states do have favourable policies for open access and have generally exempted Open Access projects from many of these charges.
Various charges under the Open Access mechanism include:
Transmission charges - Charges are payable to the transmission company for using the transmission infrastructure.
Wheeling charges - Charges are payable to the distribution company for using the infrastructure.
Transmission losses and Wheeling losses- These are the electricity losses incurred during the transmission and distribution of power.
Cross-subsidy surcharge (CSS) - These are payable by commercial and industrial buyers to fund the tariff subsidy for agricultural and residential buyers.
Additional surcharge (AS)
Banking charges
The important models are:
Open access power is a regulatory mechanism that allows a grid-connected bulk consumer with a connected load of 1MW or above to meet a part of or their entire electricity requirements via alternate energy sources.